A fixed-sample confidence interval is calibrated for a specified analysis, and repeatedly waiting for it to exclude zero can inflate false discoveries. A sequential design accounts for the inspection and stopping policy. It allows monitoring under stated assumptions while preserving a defined error budget across those decisions.
The statistical issue
Interim reviews are often operationally necessary: teams need to evaluate accumulating forecasts and decide whether a challenger deserves further observation. The statistical problem arises when an experiment is declared successful at whichever review first produces a conventional p-value below 0.05.
One conservative solution allocates significance across planned looks. Another uses a confidence sequence, whose coverage applies simultaneously over time under its assumptions. These approaches change the evidence boundary; they do not require a team to stop observing operational risk between formal reviews.
A worked example
Suppose a hypothetical experiment permits ten scheduled success decisions and has a total two-sided false-rejection budget of 5%. Assigning 0.5% to each valid test gives a union-bound error rate no greater than 10 × 0.005 = 0.05. This bound does not require independence between reviews.
Under a normal reference, each two-sided test then uses a boundary of about 2.807 standard errors instead of 1.96. An interim statistic of 2.2 would pass a single fixed-sample 5% test but would not pass this simple monitoring rule. More efficient designs can allocate the budget differently, provided their validity is justified in advance.
Practical review and implementation
Document which observations enter the experiment, when success can be declared and which changes create a new experiment. Preserve every review, including unsuccessful looks. Make the distinction between stopping for safety and declaring evidence of effectiveness explicit; a risk incident can justify suspension without demonstrating a statistical effect.
If adopting confidence sequences, check the exact conditional-mean, tail or boundedness assumptions of the chosen construction. Ordinary financial returns do not automatically meet an independent bounded-observation model. Truncation also changes the estimand and must be disclosed rather than treated as a free statistical repair.
Assumptions and limitations
The union-bound example assumes each test is valid at its assigned level and that the hypothesis remains well defined. Sequential methods do not correct undisclosed strategy redesign, future information or invalid standard errors. Time-uniform coverage is also not protection against a structural break that changes the parameter the team intends to estimate.
Primary references
Further detail on the underlying concepts and data definitions:
